A builder that owns the whole delivery chain.

Most housing is built by a chain of separate firms handing work back and forth, and every handoff costs time, money, and accountability. TESH Group was built to take those handoffs out.

Five companies. One delivery chain.

  • 01NAXA Design

    Design, Engineering & Permitting

  • 02LyteMods

    Homes, ADUs & Residential Products

  • 03Cal Steel Modular

    Structural Steel, LGS, Modular & Volumetric Systems

  • 04ADU Concepts

    Single-Family & Multifamily ADU Specialist

  • 05Cal Retrofit

    Retrofit, Compliance & Multifamily Repair

Each operating company owns a defined stage. NAXA Design plans and permits, LyteMods defines the residential products, Cal Steel Modular fabricates the steel, panels, and modules, ADU Concepts deploys ADUs, and Cal Retrofit repairs and upgrades existing buildings. TESH Group coordinates all five, so one team owns the path from the first drawing to the delivered building, across every kind of housing we take on.

Across these markets

See all markets
  • Aerial of a three-story panelized light gauge steel multifamily infill building under construction in a Los Angeles neighborhood (823 North June Street).

    Multifamily & mid-rise

  • Aerial view of the Holiday Inn & Suites in Glendale framed in light gauge steel within the surrounding neighborhood.

    Hotels & hospitality

  • Aerial view of the 17349 Roscoe Boulevard senior housing development in Northridge under construction, framed in panelized light gauge steel.

    Senior living

  • Aerial view of finished volumetric modules being set onto the building podium with a tower crane.

    Affordable & public-sector

  • Aerial of the 480 West Palm light gauge steel rebuild in Altadena, with the delivery flatbed, crane, steel frame, and the surviving ADU.

    Custom homes & fire rebuilds

  • A two-story single-family ADU framed in light gauge steel during construction.

    ADUs

Owned off-site fabrication

From master coil to finished panels or modular units.

Through Cal Steel Modular, TESH Group owns and operates its off-site production base. The facility slits light gauge steel from master coils, roll-forms it into structural studs and tracks, and panelizes them into wall, floor, and roof systems. Those panels ship flat for on-site erection, or are assembled into complete volumetric modules, homes and ADUs delivered as finished boxes ready for foundation set. Both paths start with the same owned steel production.

Wide view down the owned light gauge steel fabrication plant: roll-forming lines running the length of the floor under a high trussed roof.
Inside the owned light gauge steel fabrication plant
  • Master steel coils staged on the slitting line at the light gauge steel facility.
  • A slitting line with an overhead gantry crane in the light gauge steel plant.
  • Slit steel feeding into a roll-forming machine.
  • Operators running the slitting line at the light gauge steel facility.
  • Finished light gauge steel studs and track stacked at the plant.
  • Panelized light gauge steel assemblies loaded on a flatbed at the factory for delivery.
  • Steel-framed volumetric housing modules lined up on the factory floor.
  • A volumetric module with yellow exterior sheathing and framed window and door openings.
  • Master coil slitting to LGS tape
  • Roll-forming: profiles, tracks, studs
  • Panelized walls and components
  • Volumetric modular units: homes and ADUs
  • Wet-room pods and prefabricated assemblies
  • End-to-end quality control under one roof

Owning the production stack reduces lead time, controls quality, and protects margin across every operating company on the platform.

Shop drawings

BIM, MEP, and full pre-construction integration

TESH Group models every project in BIM before fabrication and field work begin. Architectural, structural, and MEP (mechanical, electrical, plumbing) systems are combined into a single coordinated model, so conflicts are found and resolved on screen during pre-construction rather than discovered in the field. Shop and fabrication drawings come directly off the coordinated model, and every package moves through QA/QC before it is released to the factory floor and the field.

It is how the platform keeps design, fabrication, and field execution aligned, from the first model through an approved framing inspection. Part of the integrated TESH capabilities.

BIM model of a light gauge steel-framed building showing the coordinated structural framing, floors, and roof
BIM model, light gauge steel structure
MEP coordination model showing mechanical, electrical, and plumbing systems routed through the steel frame for clash detection
MEP coordination, clash detection
TESH engineering team reviewing a BIM model of a steel structure on screen in the office
Our team, BIM modeling in-house
TESH team performing BIM coordination and quality assurance work in the office
Coordination and QA on the floor
  • BIM / Federated Modeling

    Architectural, structural, and MEP systems combined into one coordinated 3D model: a single source of truth for design, fabrication, and the field.

  • MEP Coordination

    Mechanical, electrical, and plumbing routing coordinated against the steel frame and openings, so systems fit the first time they are installed.

  • Clash Detection

    Conflicts identified and resolved in the model during pre-construction, caught on screen instead of found as a change order in the field.

  • Shop & Fab Drawings

    Panel, member, and connection shop drawings generated directly from the coordinated model, so what is fabricated matches what was engineered.

  • Pre-Construction Integration

    Design, engineering, and fabrication aligned before the first member is cut. Sequencing, buildability, and constructability are resolved up front.

  • QA / QC

    Model-based quality assurance and quality control at each stage, from released drawings through fabrication and an approved framing inspection.

Panelized light gauge steel wall sections delivered by flatbed truck to the 823 North June Street infill site.
Panelized wall sections trucked to the 823 North June Street site
  • Crane lifting a prefabricated light gauge steel wall panel into place at the 823 North June Street infill project.
    Craned into place on arrival
  • Aerial of a crane lifting panelized light gauge steel wall sections onto the 823 North June Street multifamily infill structure.
    Assembled on site in days

What integration means for you

Fewer handoffs. Faster, more predictable delivery.

Better coordination between design, permitting, steel, modular, ADU, retrofit, and field teams means a faster path to organized delivery, more resilient material strategies where they apply, and a tighter link between product design and field execution, for builders, developers, apartment owners, and public-sector clients.

One operating platform

Coordinate housing delivery through one operating platform.